PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Duct hangers at the 2nd floor Facing North-East  (800x600).jpg Electrical conduit at the Electrical Room 284 Facing North (800x600).jpg Installed temporary lighting at the 3rd floor. Facing South-East (800x600).jpg Installing gas piping at the 1st floor Facing North (800x600).jpg Installing gas piping at the 1st floor Facing South-West (800x600).jpg
Next page Duct hangers at the 2nd floor Facing North-East  (800x600)
Duct hangers at the 2nd floor Facing North-East (800x600)